Skip to content. Accessibility info.
News Release
Notice of Blasting Operations at Riverwood Drive, Timberlea
(Wednesday, August 1, 2007) - This is to inform residents, business owners and property owners that blasting operations are required to complete rock excavation at Riverwood Drive (Greenwood Heights Subdivision) in the Timberlea area. Rockwork Construction Ltd has obtained a permit to carry out the blasting. Blasting will start on or about August 3 for approximately 6 weeks. Operations can take place Monday to Friday, from 8am to 6pm. No blasting will take place on weekends or statutory holidays.
Pre-blast inspections on structures within the pre-blast radius, as outlined in by-law B-600, have been carried out. Also, residents, business owners and property owners within a 300m radius of the construction site have been given notification of the operations. All requirements outlined in the blasting by-law have been met in order to have a permit issued for this project. Seismographs will be set up on structures in the area to monitor vibration and sound levels to ensure they do not exceed allowable limits set out in HRM’s blasting by-law.
For further information, residents may contact Kevin MacDonald, HRM Engineering Technician, at 490-4653.
–30--