Skip to content. Accessibility info.

News Archives

Public Service Announcement

Joseph Howe Dr./Clinton Ave. Water Valve Replacement

(Thursday, October 14, 2010) - Attention motorists, A.C.L. Construction has been contracted by Halifax Water to undertake water main work at the intersection of Joseph Howe Drive and Clinton Avenue. This scheduled work is part of an ongoing Critical Valve Replacement Program.

In order to minimize traffic disruptions and inconvenience to Halifax Water customers, the work will be carried out on a non-stop basis starting the evening of Friday, October 15, 2010 with an expected duration of 30 hours.

To complete the work, water service will be temporarily suspended from 10 pm Friday, October 15, 2010 until approximately Sunday, October 17, 2010 at 6 am on the following streets:
Crown Dr.
Roosevelt Dr. (Chebucto Rd. to Flynn St.)
Churchill Dr. (Roosevelt Dr. to Flynn St.)
Clinton St. (Joseph Howe Dr. to end)
Joseph Howe Dr.(Lexington Ave. to Round-a-bout)

Residents affected by this temporary loss of water service have been notified.

Vehicle and pedestrian access will be maintained throughout construction.

Halifax Water and A.C.L Construction apologize for any inconvenience this necessary infrastructure work may cause.

Should you have any questions or concerns please contact:

Pat Fulton, ACL Construction Ltd., 902-483-3069

Mark Feener, Halifax Water Project Technologist, 490-4837

-30-

 

 

 

Above content last modified Tuesday, September 24, 2024 at 4:06pm.