Skip to content. Accessibility info.Excel data files range in size from 300KB to 2MB, and PDF reports range from 500KB to 2MB.
Please note the Disclaimer before downloading.
HHWQMP - Halifax Harbour Water Quality Monitoring ProgramDate 2009 | Data File (.xls) Report File (.pdf) |
January 13 | |
NOTE: On January 14, 2009, the Halifax treatment plant ceased operation due to flooding during a power failure. Work to repair the plant was completed in May 2010. | |
January 15 | |
January 21 | |
January 27 | |
February 11 | |
February 24 | |
March 11 | |
March 25 | |
April 8 | |
April 22 | |
May 5 | |
May 19 | |
June 2 | |
June 15 | |
August 26 (Supplemental) |
|
November 17 (Supplemental) |
|
June 2009 marked the end of the planned 5-year Harbour sampling program. Additional sample sets were taken in August and November 2009 to provide summer-fall data. A decision was made to suspend further regular sampling, as no new information would be gained by continuing with the Halifax treatment plant offline. Regular sampling resumed in May 2010, anticipating operational status for the Halifax and Herring Cove plants, to confirm if the water quality objectives (click for details) are achieved. |